421 Wayland Loop
Livermore, California 94550

Closed / MLS #41087386 / Single Family / Livermore
Listing information updated 4/18/2025 at 5:30pm
Welcome to your dream home! Built in 2018, this updated home feels like new! It blends modern living with outdoor serenity. Designed with luxury finishes inside and out, the open-concept layout is perfect for comfort and entertaining. The bright living area has luxury vinyl flooring and flows into a chef's kitchen with GE Monogram appliances, designer cabinetry and a "waterfall" island with seating for four. The primary bathroom features dual sinks, a soaking tub, separate shower and there's closet organization throughout the home. Outside, relax in the California Room with a Heat & Glo gas fireplace, recessed lighting, and tile flooring for year-round use. The backyard offers smart lighting, irrigation, and fresh landscaping. The garage floor has even been epoxy-coated. Perfectly located with easy access to Hwy 84 and minutes to downtown Livermore, shopping, bike trails, and wineries.

Listing Agent: Andrea Rozran

Listing Office: Christie's Int'l Re Sereno

Disclaimer: Bay East 2025. CCAR 2025. bridgeMLS 2025. Information Deemed Reliable But Not Guaranteed. This information is being provided by the Bay East MLS, or CCAR MLS, or bridgeMLS. The listings presented here may or may not be listed by the Broker/Agent operating this website. This information is intended for the personal use of consumers and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing.

Map of 421 Wayland Loop, Livermore, CA 94550

Not quite what you are looking for?

Similar listings for sale near 421 Wayland Loop, Livermore, CA 94550


Like the area?

More homes for sale near 421 Wayland Loop, Livermore, CA 94550


421 Wayland Loop, Livermore, CA 94550 is a single family home which sold for $1,505,000. 421 Wayland Loop features 3 Beds, 2 Baths. This single family home has been listed on Christie's International Real Estate Sereno since March 10th, 2025 and was built in 2018.