$1,425,000
3
beds
3
baths
1
half bath
1,660
square ft

39519 Stevenson Place
Fremont, California 94539

Closed / MLS #81996762 / Single Family / Fremont
Listing information updated 4/2/2025 at 10:44pm
Built in 2018, this 3 bed, 3.5 bath Robson-built duet home is located in the highly coveted Mission San Jose School District. The open floor plan features soaring ceilings, abundant natural light, and chefs kitchen with granite counter tops, white shaker cabinets, new refrigerator and top tier appliances. Step out onto the deck off the kitchen to enjoy unobstructed views of the community garden and Mission Hills. Luxury finishes, including vinyl plank flooring and custom designed bathrooms, enhance the homes appeal. Lower floor bedroom offers options for a office or in-laws ensuite. The top floor offers two spacious and private master suites with walk-in closets and full bathrooms. The oversized garage provides ample storage, and the community includes a playground and working garden. Superior location conveniently located near major thoroughfares, BART, and Central Park, this home provides easy access to trails, sport courts, and Lake Elizabeths activities. With top rated schools, stunning views, and unmatched comfort, this newer home is ready to welcome you.
Disclaimer: The accuracy of all information regardless of source, including but not limited to square footage and lot size, is deemed reliable but not guaranteed nor warranted and should be personally verified through personal inspection by and/or with the appropriate professionals.
Map of 39519 Stevenson Place, Fremont, CA 94539

Not quite what you are looking for?

Similar listings for sale near 39519 Stevenson Place, Fremont, CA 94539


Like the area?

More homes for sale near 39519 Stevenson Place, Fremont, CA 94539


39519 Stevenson Place is a single family home which sold for $1,425,000. 39519 Stevenson Place features 3 Beds, 3 Baths, 1 Half Bath. This single family home has been listed on Christie's International Real Estate Sereno since March 6th, 2025 and was built in 2018.